
AUTOMATION
99% Efficiency Gain for NASA AEGIS
We replaced 280+ hours of manual compliance labor with zero-error code, reducing switch configuration time from 60 minutes to seconds.
Impact
- Snapshot time reduced from 60 minutes to <60 seconds.
- 100% configuration accuracy (Zero "Missed" Devices).
- Eliminated weeks of manual labor, freeing Senior Network Engineers to focus on the architecture, not the spreadsheet.


